Why ink cost alone misleads
Ink is visible, easy to measure and easy to compare, so it tends to dominate vendor conversations. On most decoration lines, though, ink is only one of several costs, and often not the largest. Labor, changeover time, cleaning, maintenance and scrapped pieces can each outweigh it.
A process with slightly higher ink cost but faster changeovers and less scrap can easily be cheaper per good piece. A process with low ink cost but heavy cleaning or frequent rejects can cost more than it looks. The only way to know is to put every cost in the same equation.
The formula
Formula
True cost per decorated piece = (ink + consumables + labor + setup and changeover + maintenance and cleaning + scrap) ÷ good pieces
Measure every term over the same period (a shift, a week or a job) and use good pieces only as the denominator: pieces that pass inspection and ship. Dividing by total pieces printed hides the cost of rejects.
- Ink: measured consumption for the period at your real artwork coverage, including any white underbase, clear coat or primer.
- Consumables: pretreatment, cleaning fluids, wipes, filters, lamps and other wear items used in the period.
- Labor: the loaded hourly cost of everyone who touches the process: operators, setup, inspection and packing.
- Setup and changeover: tooling (screens, plates, labels) plus the labor and machine time between the last good piece of one job and the first good piece of the next, amortized over the pieces in each run.
- Maintenance and cleaning: scheduled maintenance, head cleaning and purging, spare parts and service, allocated to the period.
- Scrap: the value of blank product, ink and time lost on pieces that fail inspection.
Worked example: one week on one line (hypothetical round numbers for illustration only, not LSINC data)
- Good pieces shipped
- 10,000
- Ink, including white underbase
- $800
- Consumables (cleaning fluid, wipes, filters)
- $150
- Labor (2 people × 40 hours × $30 loaded)
- $2,400
- Setup and changeover (20 changeovers × $25)
- $500
- Maintenance and cleaning allocation
- $300
- Scrap (200 rejects × $1.25 blank, ink and time)
- $250
- Total cost for the week
- $4,400
- True cost per good piece ($4,400 ÷ 10,000)
- $0.44
What the example tells you
In this hypothetical week, ink is about 18 percent of the total and labor is more than half. Shave ten minutes off each of the 20 changeovers and you recover more than three hours of line time. Cut scrap in half and you save about as much as a 15 percent cut in ink cost would. Run the same arithmetic on your real numbers and it usually points to the same places: labor, changeover and yield.
Then test the sensitivity. What happens to cost per piece if runs get shorter and changeovers double? If a second operator is needed? If cleaning takes an extra hour a day?
A process that holds its cost per piece as your product mix changes is worth more than one that wins only on a single, ideal job.
That is how faster and cheaper turns into real ROI.
Where to find each number
- 01
Ink
Weigh or meter ink used over a known number of pieces at typical coverage. Ask vendors for measured, not calculated, consumption on your artwork.
- 02
Labor
Use loaded rates (wages plus benefits and overhead) and count every person who touches the part, including inspection and packing.
- 03
Changeover
Stopwatch data from real changeovers, last good piece to first good piece, times your changeovers per period.
- 04
Maintenance and cleaning
Service contracts, spare parts, scheduled cleaning time and the production time it removes.
- 05
Scrap
Reject counts from inspection, valued at blank cost plus the ink and time already spent.
- 06
Good pieces
Shipped, passing pieces only. This is the denominator that keeps the number honest.
Questions to ask when a vendor quotes cost per piece
At what coverage?
Which artwork and what percentage of coverage was the ink figure based on? Does it include white and clear?
With which labor?
Is labor included, and at how many operators per machine?
How many changeovers?
How many changeovers per shift were assumed, and how long does each take?
What about cleaning?
Is daily and weekly cleaning time included, along with its consumables?
Per printed piece or per good piece?
A figure per printed piece ignores yield. Ask for the per good piece number.
Questions buyers ask
What is included in cost per decorated piece?
Ink, consumables, labor, setup and changeover, maintenance and cleaning, and scrap, all divided by the number of good pieces produced in the same period.
Why divide by good pieces instead of total pieces?
Rejected pieces consumed ink, labor and blank product but earn nothing. Dividing by good pieces puts the cost of scrap where it belongs.
Is ink the biggest cost in direct-to-object printing?
Often not. Depending on coverage, run length and labor rates, labor and changeover can outweigh ink. Measure your own mix before assuming.
How do I compare cost per piece across different processes?
Use the same formula, period and assumptions for each, including tooling for analog processes and label or sleeve stock where it applies.
Can LSINC help me model cost per piece?
Yes. Send us your product and artwork. A test print on your part is the best starting point for real ink and cycle time inputs.